石油化工安全环保技术 ›› 2026, Vol. 42 ›› Issue (5): 58-61.

• 安全与环境评价 • 上一篇    

基于威布尔分布的储罐底板腐蚀速率分析和安全评价

常亮 刘峰 钱凯 李耀辉 康敬杰   

  1. 中国石油长庆油田分公司第二采气厂,陕西 榆林 719000
  • 收稿日期:2026-03-29 接受日期:2026-09-15 出版日期:2026-10-20 发布日期:2026-11-01
  • 作者简介:常亮,男, 2006 年毕业于西安石油大学石油工程专业,本科,现主要从事天然气开采企业生产建设安全环保管理等工作,工程师。 E-mail: cnpc_zz@yeah.net

Weibull-Distribution-Based Corrosion Rate Analysis and Safety Evaluation of Tank Bottom Plates

Chang Liang, Liu Feng, Qian Kai, Li Yaohui, Kang Jingjie   

  1. Second Gas Production Plant, CNPC Changqing Oilfield Branch, Yulin, Shaanxi, 719000
  • Received:2026-03-29 Accepted:2026-09-15 Online:2026-10-20 Published:2026-11-01

摘要: 为获取储罐底板整体腐蚀程度,降低漏磁检测成本,构建了基于威布尔极值分布的储罐底板腐蚀速率计算模型,采用最好线性无偏估计法( BLUE)对特征参数进行估计,引入回归周期理论实现从样本极值到总体极值的外推,进而预测最小厚度并计算腐蚀速率。结果表明:中幅板与边幅板的腐蚀速率估计值分别为 0.314 mm/a 和 0.307 mm/a,预测最小厚度均小于超声波测厚样本最小值,体现了极值外推的保守性;模型预测结果与漏磁检测结果相对误差为 -3.39%~9.14% ;储罐底板风险等级为中高风险,传统均匀腐蚀评价方法低估了实际腐蚀风险。研究结果可为检验策略的优化与检测资源的合理配置提供技术支撑。

关键词: 储罐, 威布尔分布, 腐蚀速率, 最好线性无偏估计, 回归周期

Abstract: To obtain the overall corrosion degree of tank bottom plates and reduce the cost of magnetic flux leakage detection, a calculation model for the corrosion rate of tank bottom plates based on the Weibull extreme-value distribution is constructed. Characteristic parameters are estimated using the Best Linear Unbiased Estimator (BLUE) method. Return period theory is introduced to realize extrapolation from sample extremes to population extremes, thereby predicting the minimum thickness and calculating the corrosion rate. The results show that the estimated corrosion rates of the middle plates and annular plates are 0.314 mm/a and 0.307 mm/a respectively; the predicted minimum thicknesses are all smaller than the minimum values from ultrasonic thickness measurement samples, demonstrating the conservatism of extreme-value extrapolation; the relative error between model predictions and magnetic flux leakage detection results ranges from -3.39% to 9.14%; the risk level of the tank bottom plates is medium to high; the traditional uniform corrosion evaluation method underestimates the actual corrosion risk. The findings can provide technical support for optimizing inspection strategies and rationally allocating inspection resources.

Key words: tank, Weibull distribution, corrosion rate, best linear unbiased estimate, regression period