石油化工安全环保技术 ›› 2026, Vol. 42 ›› Issue (5): 5-7.

• 事故分析与预防 • 上一篇    

非烃类气体辅助吞吐风险防控对策研究

秦洪岩   

  1. 中国石油辽河油田公司,辽宁 盘锦 124010
  • 收稿日期:2026-05-06 接受日期:2026-09-15 出版日期:2026-10-20 发布日期:2026-11-01
  • 作者简介:秦洪岩,男, 2007 年毕业于东北石油大学石油工程专业,现从事采油工艺技术的研究与管理工作 , 高级工程师。 E-mail: qinhy2@petrochina.com.cn

Causes Analysis and Protective Countermeasures for Bottom Corrosion Leakage of Vacuum Residue Tank

Qin Hongyan   

  1. Liaohe Oilfield of CNPC, Panjin, Liaoning, 124010
  • Received:2026-05-06 Accepted:2026-09-15 Online:2026-10-20 Published:2026-11-01

摘要: 超稠油蒸汽吞吐开发后期面临地层压力低、低效井占比高、汽窜严重等问题,非烃类气体辅助吞吐技术虽增油效果显著,但存在低温冻堵、高压刺漏、弱酸腐蚀、井控等安全环保风险。为此,构建全生命周期安全防范体系:安全管理上,完善制度并推行全员责任清单,开展“分类定制化”培训;技术论证与设计环节,建立四级论证机制,从措施周期、油层条件、生产参数等维度优化选井,多模型优化注剂参数;过程管控中,建立多方协作机制,实施“一收、二查、二监、三核”监督模式,推行标准化施工工艺并引入数字化监管。该体系有效防范核心风险,实现安全与效益协同提升,为技术规模化安全应用提供支撑。

关键词: 非烃类气体辅助吞吐, 安全风险防控, 全生命周期管理, 选井优化

Abstract: The late-stage development of super-heavy oil cyclic steam stimulation is typically confronted with adverse conditions including low formation pressure, a high proportion of low-efficiency wells and severe steam channeling. Although non-hydrocarbon gas-assisted cyclic steam stimulation can significantly enhance oil production, it still entails multiple safety and environmental risks, such as low-temperature freeze plugging, high-pressure jet leakage, mild acid corrosion and potential well control hazards. To mitigate the above risks, a whole-life-cycle safety protection system was established in this study. In terms of safety management, the field management regulations were improved, a full-staff responsibility list was implemented, and classified and customized professional training was systematically carried out. In the technical demonstration and design stage, a four-level verification mechanism was formulated to optimize well selection considering treatment cycles, reservoir conditions and production parameters, while multi-model simulation methods were adopted to optimize injection parameters. For on-site process control, a multi-party collaborative management mechanism was constructed. A standardized supervision mode featuring information collection, dual inspection, dual monitoring and triple verification was implemented, with standardized operation procedures and digital supervision technologies fully applied. The proposed system effectively eliminates core operational risks and realizes coordinated improvement in safety and production efficiency, providing technical support for the large-scale and safe application of the technology.

Key words: non-hydrocarbon gas-assisted cyclic steam stimulation, safety risk prevention and control, full-lifecycle management, well selection optimization